If you didn't see Blog One of this thread, do so. After the monopole was compiled and attached to apparatus of the foundation, the next phase was to raise the pole high enough off the ground to attach the generator itself.
It was such an awesome site to see it fully assembled and all of the wiring is complete to the top including the computer WiFi communications antennea on the top.