Thursday, August 27, 2009

Wind Generator - Open Hole Inspection


August 26th was our Open Hole Inspection which we passed. This allowed the scheduling for the concrete to be poured and the trench covered at 2:00 pm August 27th. Be sure and stay tuned for the blog of that big event!